J107.7 - Slopes to receive fill.  


Latest version.
  • Where fill is to be placed above the top of an existing slope steeper than 3 units horizontal to 1 unit vertical (33-percent slope), the toe of the fill shall be set back from the top edge of the existing slope a minimum distance of 6 feet (1.8 m) measured horizontally or such other distance as may be specifically recommended by a Geotechnical Engineer or Engineering Geologist and approved by the Building Official.

(Ord. 2016-0053 § 111, 2016.)