Appendix J. GRADING  


§ J101. GENERAL
J101.1 - Scope.
J101.2 - Flood hazard areas.
J101.3 - General hazards.
J101.4 - Safety precautions.
J101.5 - Protection of utilities.
J101.6 - Protection of adjacent property.
J101.7 - Storm water control measures.
J101.8 - Maintenance of protective devices and rodent control.
J101.9 - Correlation with other sections.
J101.10 - Conditions of approval.
J102.1 - Definitions.
§ J103. PERMITS REQUIRED
J103.1 - Permits required.
J103.2 - Exemptions.
J103.3 - Unpermitted grading.
J103.4 - Availability of permit at site.
J103.5 - Grading fees.
J103.6 - Compliance with zoning code.
J103.7.1 - Scope and purpose.
J103.7.2 - Form of security.
J103.7.3 - Amount of security.
J103.7.4 - Conditions.
J103.7.5 - Term of security.
J103.7.6 - Default procedures.
J103.7.7 - Right of entry.
§ J104. PERMIT APPLICATION AND SUBMITTALS
J104.1 - Submittal requirements.
J104.2 - Site plan requirements.
J104.2.1 - Grading designation.
J104.2.2 - Regular grading requirements.
J104.2.3 - Engineered grading requirements.
J104.3 - Geotechnical and engineering geology reports.
J104.4 - Liquefaction study.
§ J105. INSPECTION
J105.1 - General.
J105.2 - Special and supplemental inspections.
J105.3 - Field engineer.
J105.4 - Geotechnical engineer.
J105.5 - Engineering geologist.
J105.6 - Permittee.
J105.7 - Required inspections.
J105.8 - Notification of noncompliance.
J105.9 - Transfer of responsibility.
J105.10 - Non-inspected grading.
J105.11 - Routine field inspections and reports.
J105.12 - Completion of work.
J105.13 - Notification of completion.
J105.14 - Change of ownership.
J106.1 - Maximum cut slope.
§ J107. FILLS
J107.1 - General.
J107.2 - Surface Preparation.
J107.3 - Benching.
J107.4 - Fill material.
J107.5 - Compaction.
J107.6 - Maximum slope.
J107.7 - Slopes to receive fill.
J107.8 - Inspection of fill.
J107.9 - Testing of fills.
§ J108. SETBACKS
J108.1 - General.
J108.2 - Top of slope.
J108.3 - Toe of fill slope protection.
J108.4 - Alternate setbacks.
§ J109. DRAINAGE AND TERRACING
J109.1 - General.
J109.2 - Drainage terraces.
J109.3 - Interceptor drains and overflow protection.
J109.5 - Disposal.
§ J110. SLOPE PLANTING AND EROSION CONTROL
J110.1 - General.
J110.3 - Planting.
J110.4 - Irrigation.
J110.5 - Plans and specifications.
J110.6 - Rodent control.
J110.7 - Release of security.
J110.8.1 - General.
J110.8.2 - Storm Water Pollution Prevention Plan (SWPPP).
J110.8.3 - Erosion and Sediment Control Plans (ESCP).
J110.8.4 - Storm Water Pollution Prevention Plan (SWPPP), effect of noncompliance.
J110.8.5 - Noncompliance penalties.
§ J111. REFERENCED STANDARDS