§ 20.32.530. End structures—Location specifications.  


Latest version.
  • End structures shall be placed at whichever of the following locations is farthest up grade:

    A.

    Not less than 10 feet upgrade from the downgrade lot line of the last lot being served;

    B.

    Not more than 40 feet downgrade from the upgrade lot line of the last lot being*served, if there may be a future extension of the main-line sewer;

    C.

    At a location where the house lateral and building sewer can be constructed in a straight alignment at right angles to the main-line sewer.

(Ord. 10020 § 3 (part), 1970: Ord. 6130 Part 5 Ch. 6 § 5612, 1952.)