§ 20.24.200. Notification of uncontrolled discharges required.  


Latest version.
  • A.

    In the event of an uncontrolled discharge, the discharger or permittee shall immediately notify the director of the incident by telephone. The notification shall include location of discharge, type of material, concentration and volume, and corrective actions taken.

    B.

    Within 10 days after the uncontrolled discharge, the discharger or permittee shall submit to the director a detailed written report describing the cause of the discharge, corrective action taken and measures to be taken to prevent future occurrences. Such notification shall not relieve the discharger or permittee of liability or fines incurred as a result of the uncontrolled discharge.

(Ord. 89-0101 § 22, 1989.)