§ 16.38.120. Map of facilities installed in highways—Annual filing required.  


Latest version.
  • A.

    The grantee, except the grantee of a franchise for a railroad track, shall file with the road commissioner, within 90 days after the effective date of the ordinance granting the franchise, and each year thereafter within 90 days after the anniversary of the effective date of said ordinance, a map or set of maps, each drawn to a scale not smaller than 600 feet to one inch, showing in detail the exact location and size of all facilities, except service connections used by or under the control of the grantee, installed beneath the surface of the highways described in and maintained pursuant to the authority of the ordinance granting the franchise.

    B.

    The map or set of maps filed pursuant to the provisions of this section shall show in detail the location of such facilities, excluding service connections, which shall have been laid, constructed or abandoned subsequent to the filing of the last preceding map or set of maps. Each map or set of maps shall be accompanied by an affidavit endorsed thereon and subscribed and sworn to by the grantee, verifying the correctness thereof.

(Ord. 12420 § 12, 1981: Ord. 7468 Art. 1 § 149, 1959.)