S-3 - Permits Required.  


Latest version.
  • It shall be unlawful for a person, firm, or corporation to construct, install, alter, repair, replace, or remodel a solar thermal energy system regulated by this Code or cause the same to be done without first obtaining a separate permit for each separate system or interconnected set of systems as specified in Section 103.0 of this Code.

(Ord. 2016-0055 § 20, 2016: Ord. 2013-0050 § 22, 2013.)