§ 107.1. Building Permit Fees.*  


Latest version.
  • In addition to a permit issuance fee of $31.10, a fee for each building permit shall be paid to the Building Official as set forth in Table 1-A.

    The determination of value or valuation under any of the provisions of this code shall be made by the Building Official. The valuation to be used in computing the permit and plan check fees shall be the total value of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire protection systems and any other permanent work or permanent equipment.

    EXCEPTIONS:

    1.

    The total permit fee for a combined swimming pool permit, as provided in Section 106.5.7, shall be two times the building permit fee determined from Table 1-A and the barrier inspection fee of Section 107.9, item K.

    2.

    The total permit fee for a combined building permit, as provided in Section 106.5.6, shall be 1.60 times the building permit fee determined from Table 1-A.

    (Ord. 2016-0053 § 2, 2016; Ord. 2013-0048 § 2, 2013; Ord. 2007-0108 § 2 (part), 2007; Ord. 98-0020 § 6, 1998; Ord. 95-0065 § 3 (part), 1995.)

    *  Editor's note: Fee changes in this section were made by the Director of Public Works due to increases in the Consumer Price Index and are effective July 1, 2018.