§ 106.4.4.2. Deferred Submittals.  


Latest version.
  • For the purposes of this Section, "deferred submittals" are defined as those portions of the design which are not submitted at the time of the application and which are to be submitted within a period specified by the Building Official.

    Deferral of any submittal items shall have prior approval of the Building Official. The architect or engineer of record shall list the deferred submittals on the plans and shall submit the deferred submittal documents for review by the Building Official.

    Submittal documents for deferred submittal items shall be submitted to the architect or engineer of record who shall review them and forward them to the Building Official with a notation indicating that the deferred submittal documents have been reviewed and that they have been found to be in general conformance with the design of the building. The deferred submittal items shall not be installed until their design and submittal documents have been approved by the Building Official.

    (Ord. 2013-0048 § 2, 2013; Ord. 95-0066 § 6 (part), 1995.)

    106.5   Permits.