§ 21.40.080. Soils report.  


Latest version.
  • A.

    The subdivider shall submit a preliminary soils report with each tentative map when required by the county engineer.

    B.

    The report shall be prepared by a registered civil engineer and be based upon adequate test borings or excavations.

    C.

    The report shall be submitted in hardcopy format and also in an electronic version on a compact disc in Adobe® Portable Document Format (PDF) with searchable text. The report shall include the civil engineer's seal, signature, license number, and the date on which the civil engineer signed and affixed his or her seal to the report.

(Ord. 2005-0058 § 2, 2005: Ord. 11665 § 25, 1978: Ord. 4478 Art. 6 § 94.1, 1945.)