§ 20.56.034. Inert debris engineered fill operations.  


Latest version.
  • "Inert debris engineered fill operations" means a disposal activity exceeding one (1) year in duration in which fully cured asphalt, uncontaminated concrete (including steel reinforcing rods embedded in the concrete), brick, ceramics, clay and clay products, which may be mixed with rock and soil, are spread on land in lifts and compacted under controlled conditions to achieve a uniform and dense mass which is capable of supporting structural loading as necessary, and having other characteristics appropriate for an end use approved by all governmental agencies having jurisdiction, such as roads, building sites, or other improvements, where an engineered fill is required to facilitate productive use of the land.

(Ord. 2011-0042 § 75, 2011.)