§ 23.07. Inspection to Ascertain Compliance—Access Required.  


Latest version.
  • A.

    The Chief Engineer may inspect, in any manner consistent with State law, as often as he/she deems necessary, any publicly or privately owned storm drain, storm drain connection, street, gutter, yard, plant, storage facility, building, or other facility, and any BMP, NPDES permit, SWPPP, or stormwater management plan, as necessary to ascertain whether any provision of this code, any agreement with the District, or of any authorization, approval or permit issued by the District pursuant to this chapter, has been violated.

    B.

    In the course of such inspection, the Chief Engineer may, in any manner consistent with State law:

    1.

    Inspect, sample, and make flow measurements of any runoff, discharge or threatened discharge to any District storm drain;

    2.

    Place on the premises devices for runoff or discharge sampling, monitoring, flow measuring or metering;

    3.

    Inspect, copy, or examine any records, reports, plans, test results or other information required to carry out the provisions of this chapter, to the extent allowed by law; and

    4.

    Photograph any materials, storage areas, waste, waste containers, BMP, vehicle, connection, discharge, runoff and/or violation discovered during an inspection.

(Ord. 2013-0034 § 3, 2013.)